Redesign · Go-Live

Wevise Launch Cutover Plan

Updated Saturday, August 8, 2026 · 7:22 PM CDT

The full redesign is built as hidden drafts in the new navy design system — every page now carries the flagship full-bleed hero + green-accent treatment, hero photography, and the real Wevise logo. This is the exact sequence to flip it live in one clean cutover, plus the content still owed and the pre-flight QA.

Target Sep 1, 2026 Model Atomic cutover All 20 pages built Design applied site-wide Preview deck ready Live site untouched

New Changes since the last report · Aug 8 (morning → evening)

⏳ Due in the next 7 days Aug 8 – 15

ActionOwnerDue
Confirm final page copy — lock & hand off before Thomas departs (8/14)Aruna + JonAug 13

On the horizon: Aug 17 Annual Report (Stephen + Jon + Janice + Maggie) · Aug 18 homepage stats (Aruna), Chicago TechPath eligibility (Ashley), Donate transparency (Jon).

Preview the new design

Full-page mockups of all six core pages — the flagship homepage plus the five journey pages — as reviewed on Aug 5.

Open in a browser, or Print → Save as PDF to share: View the full-page preview deck →

Why a single cutover

The one constraint that shapes the plan.

Elementor 4.2.1 on this site can't scope a header/footer to specific pages via the API — it's site-wide or off. So the new shell goes live for everyone the moment it's switched on. The fix is to have every page's new content in place first, then flip the shell once. Page drafts stay safely hidden until then.

Cutover sequence

Run top to bottom on launch day (ideally a low-traffic window). Each step is reversible.

1

Freeze & back up

Take a full backup (All-in-One WP Migration is installed). Confirm all content placeholders below are filled.

2

Port the rebuilt pages into their live URLs

Copy each “2026” draft's Elementor data into the matching live page so URLs and SEO history are preserved (see Port Map).

3

Publish the net-new pages

Flip /get-involved/, /mentee/, /resources/ (and /industry-insights/ only if owned) to Published.

4

Set the new Homepage

Point Settings → Reading to the new Homepage (or port its content into the current front page #1237).

5

Activate the new shell

Set header #4294 + footer #4296 conditions to include/general; set old header #2043 + footer #1374 to inactive.

6

Swap navigation

Assign the Primary 2026 menu (#23) to the Primary + Mobile locations.

7

Brand + redirects

Set the new blue logo as the site logo, fix the org-schema logo URL, and add the 301 redirects (see Redirects).

8

Purge, smoke-test, monitor

Clear all caches, run the QA checklist, then watch analytics and error logs for the first 24–48h.

Port map — draft → live

Where each built draft lands. Porting into existing IDs keeps the URL and its SEO equity.

Built draftGoes toAction
Homepage 2026 · #4306/Front page
Get Involved · #4274/get-involved/Publish new
Get Mentorship · #4275/mentee/Publish new
Resources · #4276/resources/Publish new
Industry Insights · #4277/industry-insights/If owned
Become a Mentor 2026 · #4312/become-a-mentor/ · #1433Port into live
Partner 2026 · #4314/partnerships/ · #1325Port into live
Chicago TechPath 2026 · #4316/techpath-alliance/ · #3297Port into live
Donate 2026 · #4318/donate/ · #3853Port into live
Donate — Chicago TechPath 2026 · #4370/donate-chicago/ · #3647Port into live
Our Team 2026 · #4328/our-team/ · #1020Port into live
About Us 2026 · #4372/about-us/ · #664Port into live
Contact Us 2026 · #4374/contact-us/ · #2669Port into live
Volunteer 2026 · #4376/volunteer/ · #1309Port into live
Coaching Corner 2026 · #4378/coaching-corner/ · #2719Port into live
Our Stories 2026 · #4380/blogs/ · #2061Port into live
Blacks in Technology 2026 · #4382/blacks-in-technology/ · #3410Port into live
Code Your Dreams 2026 · #4383/code-your-dreams/ · #3449Port into live
DPI 2026 · #4384/dpi/ · #3436Port into live
Northwestern 2026 · #4385/northwestern/ · #3427Port into live

Redirects (301)

Most URLs are retained. Add these only if the paths are renamed. Needs the Redirection plugin.

Old pathNew pathNote
/blogs//stories/Only if slug is changed; otherwise keep + relabel
/techpath-alliance//chicago-techpath/Optional canonicalization
About, Team, Contact, Donate, Volunteer, Partnerships, Become-a-mentor — retained, no redirect needed.

Content still owed (fill before launch)

Each maps to a flagged placeholder in the drafts.

Action items · owners · due dates

Working backward from a Sep 1 launch. Owners are a starting point — reassign as needed. Jon = implementation.

ActionOwnerDueStatus
Confirm final page copy — lock & hand off before Thomas departs (8/14)Aruna + JonAug 13Open
Annual Report — produce & finalize (feeds Donate transparency links)Stephen + Jon + Janice + MaggieAug 17Open
Homepage impact stats (real numbers)ArunaAug 18Open
Donate: link the Annual Report + transparency (structure built ✓)JonAug 18Open
Chicago TechPath: eligibility + Cohort 1 resultsAshleyAug 18Open
Team: roster sign-off + new leadership photos + circular cropsJon + RossAug 6Done
Mentor: replace or drop the old videoAruna + AshleyAug 21Open
Old green logo: removed from SEO schema ✓ (visible logo rides the cutover shell)JonAug 8Done
Newsletter → Mailchimp (footer signup, MC4WP)Jon + ArunaAug 6Done
Buttons → accessible Deeper Blue (WCAG contrast)JonAug 7Done
WCAG 2.1 AA / ADA assessment + fixes appliedJonAug 7Done
Port pages to live URLs + publish new pages (staging)JonAug 28Open
Set up 301 redirects (Redirection plugin)JonAug 28Open
Full QA sweep (links, forms, mobile, a11y, analytics)TeamAug 28Open
Go live: activate new shell + swap nav + smoke testJonSep 1Open
Post-launch monitoring (CTAs, donations, broken links)Jon + RossSep 1 – 30Open
Build shell + all 9 pages in new design systemJonAug 4Done
Rebuild remaining pages in the new design — Contact, Volunteer, Coaching Corner, Stories + 4 partner co-brand pages (redesign now complete, 20 pages)JonAug 8Done
Privacy Policy written + publishedJonAug 4Done
Donate: Givebutter form (fixed + verified live, WeviseDonate campaign) + gift amounts + EINJonAug 8Done
SEO dedupe (Yoast only) + homepage title fixJonAug 4Done
Footer socials + EIN + hero copy polishJonAug 4Done
Apply flagship design (full-bleed heroes + green accents) to all pagesJonAug 5Done
Hero photography + section icons across all pagesJonAug 5Done
Shift primary CTAs to green (brand direction)JonAug 5Done
Build Our Team page from the org chartJonAug 5Done
Real Wevise logo in new header + footerJonAug 5Done
Full-page preview deck for team reviewJonAug 5Done

Cleanup & QA

Housekeeping

  • Privacy Policy — written & published
  • EIN — real number (92-2591102) in place
  • Orphaned clone drafts deleted
  • Deactivated AIOSEO (Yoast only) + fixed homepage title
  • Footer socials added (IG, FB, YouTube, Bluesky)
  • Flagship design + hero photos applied to all pages
  • Real Wevise logo in new header + footer
  • Old green logo removed from the SEO schema (visible logo swaps at cutover)

Pre-launch QA

  • All internal + app-handoff links resolve
  • Forms submit (contact, newsletter, donation)
  • Mobile layout + sticky action bar
  • Accessibility: dropdowns, contrast, alt text
  • Analytics events fire (CTAs, donate, signup)
  • Redirects return 301, no broken links

Rollback: if anything looks wrong after step 5, set the new shell conditions back to empty and re-activate old header #2043 / footer #1374 — the site returns to its current state instantly. Page ports are reversible from the backup.