Redesign · Team Overview
Updated Saturday, August 8, 2026 · 7:22 PM CDT
A team-facing snapshot of the website redesign: what's already done, what content we still need, and who owns what by when. Every page now has the new look — full-width hero photos, green accents, and our real logo — and you can preview the whole thing below. The new site is built and waiting; the live site is untouched until launch day.
New What's changed since the last update · Aug 8 (through the evening)
⏳ Due in the next 7 days Aug 8 – 15
| Action | Owner | Due |
|---|---|---|
| Confirm final page copy — hand off before Thomas leaves (8/14) | Aruna + Jon | Aug 13 |
On the horizon: Aug 17 Annual Report (Stephen + Jon + Janice + Maggie) · Aug 18 homepage stats (Aruna), Chicago TechPath eligibility (Ashley), Donate transparency (Jon).
Full-page mockups of all six core pages — the homepage plus the five journey pages.
Take a look and share feedback — open in a browser, or Print → Save as PDF: View the full-page preview deck →
How the switch-over works, in plain terms.
Rather than change pages one at a time, the entire redesign goes live in a single switch. That keeps the experience consistent — visitors never see a half-old, half-new site — and it means the current site stays exactly as it is until launch day. The trade-off: every page's new content needs to be ready before we flip the switch. That's what the list below is for.
The pages are built — these are the real details only the team can provide.
Working backward from a Sep 1 launch. Owners are a starting point — reassign as needed.
| Action | Owner | Due | Status |
|---|---|---|---|
| Confirm final page copy — hand off before Thomas leaves (8/14) | Aruna + Jon | Aug 13 | Open |
| Annual Report — produce & finalize | Stephen + Jon + Janice + Maggie | Aug 17 | Open |
| Homepage impact stats (real numbers) | Aruna | Aug 18 | Open |
| Donate: link the Annual Report + transparency (structure built ✓) | Jon | Aug 18 | Open |
| Chicago TechPath: eligibility + Cohort 1 results | Ashley | Aug 18 | Open |
| Team: roster sign-off + new leadership photos + circular crops | Jon + Ross | Aug 6 | Done |
| Mentor: replace or drop the old video | Aruna + Ashley | Aug 21 | Open |
| Old green logo: cleaned from SEO data ✓ (visible logo swaps at launch) | Jon | Aug 8 | Done |
| Newsletter → Mailchimp (footer signup) | Jon + Aruna | Aug 6 | Done |
| Buttons → accessible blue (readability) | Jon | Aug 7 | Done |
| Accessibility (ADA / WCAG 2.1 AA) review + fixes | Jon | Aug 7 | Done |
| Final QA + pre-launch checks | Team | Aug 28 | Open |
| Go live | Jon | Sep 1 | Open |
| Post-launch monitoring (first 30 days) | Jon + Ross | Sep 1 – 30 | Open |
| Build shell + all 9 pages in new design system | Jon | Aug 4 | Done |
| Give the remaining pages the new design — Contact, Volunteer, Coaching Corner, Stories + 4 partner co-brand pages (redesign now complete, 20 pages) | Jon | Aug 8 | Done |
| Privacy Policy written + published | Jon | Aug 4 | Done |
| Donate: form fixed & tested (live WeviseDonate campaign) + gift amounts + EIN | Jon | Aug 8 | Done |
| SEO cleanup + homepage title | Jon | Aug 4 | Done |
| Footer socials + EIN + copy polish | Jon | Aug 4 | Done |
| New design (hero photos + green accents) on all pages | Jon | Aug 5 | Done |
| Build the Our Team page from the org chart | Jon | Aug 5 | Done |
| Real Wevise logo in header + footer | Jon | Aug 5 | Done |
| Full-page preview deck to review | Jon | Aug 5 | Done |
Fully reversible: the launch is designed to roll back instantly. If anything looks off on go-live day, the site returns to its current state in one step, with a full backup as a safety net.