Redesign ยท Team Overview
Updated Wednesday, August 5, 2026 ยท 7:17 PM CDT
A team-facing snapshot of the website redesign: what's already done, what content we still need, and who owns what by when. Every page now has the new look โ full-width hero photos, green accents, and our real logo โ and you can preview the whole thing below. The new site is built and waiting; the live site is untouched until launch day.
New What's changed since the last update ยท Aug 4 โ Aug 5
Full-page mockups of all six core pages โ the homepage plus the five journey pages.
Take a look and share feedback โ open in a browser, or Print โ Save as PDF: View the full-page preview deck โ
How the switch-over works, in plain terms.
Rather than change pages one at a time, the entire redesign goes live in a single switch. That keeps the experience consistent โ visitors never see a half-old, half-new site โ and it means the current site stays exactly as it is until launch day. The trade-off: every page's new content needs to be ready before we flip the switch. That's what the list below is for.
The pages are built โ these are the real details only the team can provide.
Working backward from a Sep 1 launch. Owners are a starting point โ reassign as needed.
| Action | Owner | Due | Status |
|---|---|---|---|
| Confirm final page copy โ hand off before Thomas leaves (8/14) | Aruna + Jon | Aug 13 | Open |
| Annual Report โ produce & finalize | Stephen + Jon + Janice + Maggie | Aug 17 | Open |
| Homepage impact stats (real numbers) | Aruna | Aug 18 | Open |
| Donate: annual report + transparency links | Jon | Aug 18 | Open |
| Chicago TechPath: eligibility + Cohort 1 results | Ashley | Aug 18 | Open |
| Team: final check on roster, titles & headshots | Jon + Ross | Aug 21 | Open |
| Mentor: replace or drop the old video | Aruna + Ashley | Aug 21 | Open |
| Replace old green logo site-wide | Jon | Aug 21 | Open |
| Connect newsletter to Mailchimp | Jon + Aruna | Aug 26 | Open |
| Final QA + pre-launch checks | Team | Aug 28 | Open |
| Go live | Jon | Sep 1 | Open |
| Post-launch monitoring (first 30 days) | Jon + Ross | Sep 1 โ 30 | Open |
| Build shell + all 9 pages in new design system | Jon | Aug 4 | Done |
| Privacy Policy written + published | Jon | Aug 4 | Done |
| Donate: form + gift amounts + EIN | Jon | Aug 4 | Done |
| SEO cleanup + homepage title | Jon | Aug 4 | Done |
| Footer socials + EIN + copy polish | Jon | Aug 4 | Done |
| New design (hero photos + green accents) on all pages | Jon | Aug 5 | Done |
| Build the Our Team page from the org chart | Jon | Aug 5 | Done |
| Real Wevise logo in header + footer | Jon | Aug 5 | Done |
| Full-page preview deck to review | Jon | Aug 5 | Done |
Fully reversible: the launch is designed to roll back instantly. If anything looks off on go-live day, the site returns to its current state in one step, with a full backup as a safety net.