Wevise · Website Redesign
One home for the launch plan. Bookmark this page (or either live report) — the live links always show the latest, and past versions are one click away in the archive at the bottom.
Reports last updated Aug 26, 2026 at 1:31 PM CDT
These links never change. Each republish updates them in place, so a bookmark is always up to date.
Every color the redesigned site actually renders, measured against the new Wevise token set. Only 2 of ~29 colors in use match a token today — plus two gaps in the token set itself, including a purple that is on every page and has nowhere to go.
This week at a glance: what's open, planned, in progress and completed — plus what's blocked and who is waiting on whom. Now carries the five findings from the Aug 23 cutover rehearsal, one of them a launch blocker.
The team-facing snapshot: what's done, content still needed, owners & due dates.
The full plan: cutover sequence, port map, redirects, rollback, owners & dates.
Two jobs keep the sandbox and this report honest. Neither runs from this page — these copy the command for you to paste into the right terminal.
Lightsail browser SSH · wevise-sandbox (54.214.69.158)
Pulls the current WordPress drafts from production into the sandbox and rebuilds the Elementor CSS. Copies page bodies only — not the footer template, the menu, or the Elementor kit, so the sandbox shell stays behind production by design.
PowerShell on your machine · .claude\.audits
Crawls 21 templates across 3 browsers and 8 viewports, then runs Lighthouse on each. Measured at 14 min 47 s on the Aug 26 run; Lighthouse is the last three minutes and looks stalled while it works. Sync first — otherwise it measures yesterday’s content.
The bar shows time elapsed against a typical run, not real progress. Nothing on this page can see the job — it is a static site with no connection to either machine. A job that finishes early or hangs will not change the bar; read the terminal for truth.
Other shareable pieces of the redesign.
How it works: the "Live" links above are the ones to bookmark and share — they always reflect the newest version. Whenever the plan changes, the update lands on those same URLs; every past version is kept in the project's version history, and the archive below preserves the early snapshots. Nobody needs a new link.
Frozen dated snapshots from before the reports moved into version control (Aug 20), newest first — each carries an "archived" banner so it's never mistaken for the live version. Since Aug 20, every published version is preserved in the project's git history instead.
| Version | Team Overview | Master Plan |
|---|---|---|
Aug 23, 2026Close of the Aug 15–23 reporting week — 29 completed items, including the sandbox build at sandbox.wevise.org and the cutover rehearsal that found the footer launch blocker |
Status board snapshot → | |
| Aug 8, 2026Redesign build complete — all 20 pages (added Contact, Volunteer, Coaching Corner, Stories + 4 partner co-brand pages; port map updated) · earlier that day: Donation form fixed & verified on live + redesign (live WeviseDonate campaign) · buttons unified to accessible blue · WCAG 2.1 AA / ADA assessment + fixes · old green logo removed from SEO schema (org name set to “Wevise”) | Snapshot → | Snapshot → |
| Aug 6, 2026Team page finalized — new leadership photos, circular crops, Team section removed · Thomas handoff checklist sent · Donate transparency section built · Newsletter wired to Mailchimp (footer) | Snapshot → | Snapshot → |
| Aug 5, 2026Design applied site-wide · logo · preview deck · owners assigned · Thomas handoff · Annual Report added | Snapshot → | Snapshot → |